Aurora Heights build
Aurora Heights · Switched on November 2026

The job
Designed alongside a newly constructed home, this solar system was integrated into the build from day one, ensuring maximum efficiency and a clean architectural finish.
The challenge
The project required close coordination between the builder, electricians, and our installation team to ensure every component was completed on schedule before occupancy.
The approach
We installed a premium solar array with integrated battery storage and smart energy monitoring before the homeowners moved in. The project was completed in 16 days following roof completion.
"Planning solar during construction was one of the best decisions we made. Everything was ready the day we moved in."
Ethan & Mia Carter
Specs
System size
14.8 kW
Panels
37 × 400W
Install time
16 Days
Warranty
25 Years
(From the install)